    In the automation project using Rockwell CompactLogix 5370 PLC and 1734-AENTR distributed IO modules, we experienced a profound baptism from ideal design to reality. Although the unified use of L1 series PLCs does achieve standardization of component management, there are many technical limitations and cost traps behind this choice that have not been fully evaluated.

    The most shocking discovery at the beginning of the project was the strict limitation that each 5370 L1 controller only supports 6-8 expansion modules. After comparing the specifications of each module of the Siemens S7-1200 series supporting 32 points of IO, we had to configure three times the number of 1734 modules for the Rockwell solution. What was even more unexpected was that each module must be equipped with a dedicated base unit (1734-TOPS), a hard requirement that was ignored in the early selection, which ultimately led to an unexpected 20% increase in the bill of materials cost.

    In terms of HMI selection, the compromise of PanelView 800 also brought profound lessons. Its hard upper limit of 200 tags forced engineers to redesign the entire variable architecture, while the limit of 25 screens severely restricted the optimization space of the human-computer interaction experience. Although it seems to save costs compared to PanelView 5000, these implicit constraints actually caused the workload of later development to increase exponentially.

    In-depth analysis of this case, we found several key revelations: First, the cost evaluation of the IO system must adopt the "full life cycle calculation method", in addition to the module itself, all related costs such as the base, cables, and installation hours must be included. Second, HMI selection cannot only look at the price, but must evaluate the impact of its functional limitations on system availability and later maintenance. Most importantly, the so-called "standardization" strategy requires dynamic evaluation. When the technical limitations of a single brand begin to seriously affect system performance, it may be a wiser choice to moderately introduce third-party solutions.

    From the perspective of technical architecture, this project exposes a common contradiction in the field of industrial automation: there is often a huge gap between the ideal flexibility of modular design and the actual expansion capabilities of the hardware platform. Although Rockwell's ecosystem is complete, its strict specification restrictions often put engineers in the dilemma of "taking money from one pocket to pay for another."

    Looking ahead, we believe that industrial automation selection needs to establish a more complete three-dimensional evaluation system: the first dimension is technical performance, the second dimension is overall cost, and the third dimension is system flexibility. Only solutions that achieve a balance in all three dimensions can truly stand the test of time. This lesson learned with real money is worth pondering for every automation engineer.

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit
Contact Us:lizzie@swanautomation.com

Home

Products

whatsapp

contact